Data Center Statistics 2026

This page brings together measured and modeled figures on data centers: how much electricity they use, how much capacity exists and is under construction, where it is being built, what the largest operators spend, and how efficiently facilities use power and water. It covers the world, the United States, North America and Ireland, mostly with data from 2024 to 2026. Sources are the International Energy Agency, Lawrence Berkeley National Laboratory, the Department of Energy, the Energy Information Administration, Ireland's Central Statistics Office, Uptime Institute, Synergy Research Group, CBRE, JLL, PJM and filings and reports from Amazon, Alphabet, Google, Meta, Microsoft and Digital Realty. Each figure carries the sentence it was taken from and a link to the page.

Compiled by the FruitPunch research desk · Updated November 15, 2026

figures
54
sources
26
publishers
16

The short answer

Data centers used about 415 TWh of electricity in 2024, 1.5% of the world total, and the IEA expects about 945 TWh by 2030. In the United States they used 4.4% of electricity in 2023 (Berkeley Lab), Synergy Research expects U.S. capacity to double within three years, and Amazon alone spent $75.9 billion on capital expenditures in the third quarter of 2026. Industry efficiency has stalled: the average PUE was 1.52 in Uptime Institute's 2026 survey.

Quote these

Key findings

Each finding names who published it. Copy it with the source attached, or jump to it in context.

  1. 415 TWh#1

    Data centers worldwide consumed about 415 TWh of electricity in 2024, roughly 1.5% of global electricity use, by IEA estimates.

    Source: International Energy Agency, Apr 2025

    In context
  2. 4.4%#2

    U.S. data centers used about 4.4% of all U.S. electricity in 2023, according to Berkeley Lab's report for the Department of Energy.

    Source: Lawrence Berkeley National Laboratory, Jan 2025

    In context
  3. 48%#3

    Hyperscale operators accounted for 48% of worldwide data center capacity at the end of 2025.

    Source: Synergy Research Group, Apr 2026

    In context
  4. Double#4

    Synergy expects total U.S. data center capacity to double between mid-2026 and mid-2029.

    Source: Synergy Research Group, Jul 2026

    In context
  5. 71%#5

    Operational hyperscale capacity in Texas grew 71% over the year to mid-2026, against 36% worldwide.

    Source: Synergy Research Group, Aug 2026

    In context
  6. $75.9 billion#6

    Amazon's cash capital expenditures were $75.9 billion in the third quarter of 2026, up from $34.2 billion a year earlier, mostly for technology infrastructure.

    Source: Amazon, Oct 2026

    In context
  7. 1.52#7

    The average annual PUE reported by data center operators was 1.52 in 2026, continuing seven years of little change.

    Source: Uptime Institute, Jul 2026

    In context
  8. 85,000 MW#8

    PJM expects its summer peak to rise about 85,000 MW to over 241,000 MW over the 15 years from 2026.

    Source: PJM Interconnection, Jan 2026

    In context

Reading the numbers

Electricity is the clearest measure of the data center boom. The IEA puts global use at about 415 TWh in 2024, 1.5% of world electricity, growing around 12% a year, and its Base Case doubles that to about 945 TWh by 2030. The United States accounts for 45% of the total. Berkeley Lab estimates U.S. data centers used 176 TWh, or 4.4% of national electricity, in 2023 and could use 6.7% to 12% by 2028. In Ireland, where meters rather than models measure it, data centres used 23% of electricity in 2025.

Capacity is shifting to a few very large operators. Synergy Research Group counts 1,360 hyperscale data centers holding 48% of worldwide capacity at the end of 2025 and expects that share to reach 67% by 2031. In North America, JLL reports 66 GW under construction and CBRE a record 7,481 MW in eight primary markets, while vacancy stays at 1% to 1.4% because most space is leased before completion. Location is concentrated in Northern Virginia, but Texas grew its hyperscale capacity 71% in a year, against 36% worldwide.

Spending figures from company filings show the scale of the build-out. Amazon's cash capital expenditures reached $75.9 billion in the third quarter of 2026, Alphabet's $51.4 billion and Meta's $34.91 billion, and Meta expects $135 to $145 billion for the full year. Much of this money buys servers and AI chips rather than buildings, and each company defines capital spending slightly differently.

Efficiency gains are slowing just as demand surges. Uptime Institute's 2026 survey puts the average PUE at 1.52, near where it has been for seven years, while Google reports 1.09 for its own fleet. Typical rack density passed 11 kW, and 24% of operators now run some racks at 30 kW or more. Water use is rising too: Google consumed 10.9 billion gallons in 2025. Grid operators are responding, with PJM expecting its summer peak to rise about 85,000 MW in 15 years and the IEA warning that about 20% of planned projects could be delayed by grid constraints.

1

How much electricity data centers use

  1. 1
    415 TWh

    Data centers worldwide consumed about 415 TWh of electricity in 2024, roughly 1.5% of global electricity use, by IEA estimates.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    Data centres accounted for around 1.5% of the world’s electricity consumption in 2024, or 415 terawatt-hours (TWh).
  2. 2
    45%

    The United States accounted for 45% of global data center electricity use in 2024, ahead of China at 25% and Europe at 15%.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    The United States accounted for the largest share of global data centre electricity consumption in 2024 (45%), followed by China (25%) and Europe (15%).
  3. 3
    945 TWh

    The IEA's Base Case projects global data center electricity use will more than double to about 945 TWh by 2030.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    Electricity demand for data centres more than doubles by 2030 Data centre electricity consumption is set to more than double to around 945 TWh by 2030.
  4. 4
    4.4%

    U.S. data centers used about 4.4% of all U.S. electricity in 2023, according to Berkeley Lab's report for the Department of Energy.

    Exact wording at the source
    Data centers consumed about 4.4% of total U.S. electricity in 2023 and, depending upon how much the rest of the economy grows, are expected to consume between 6.7 and 12% of total U.S. electricity by 2028.
  5. 5
    176 TWh

    U.S. data center electricity use rose from 58 TWh in 2014 to 176 TWh in 2023 and is estimated to reach 325 to 580 TWh by 2028.

    Exact wording at the source
    The total data center electricity usage climbed from 58 TWh in 2014 to 176 TWh in 2023 and is estimated to increase between 325 to 580 TWh by 2028.
  6. 6
    6.7 to 12%

    The Department of Energy expects data centers to use about 6.7% to 12% of total U.S. electricity by 2028.

    Source: U.S. Department of Energy, Dec 2024

    Exact wording at the source
    The report finds that data centers consumed about 4.4% of total U.S. electricity in 2023 and are expected to consume approximately 6.7 to 12% of total U.S. electricity by 2028.
  7. 7
    About half

    U.S. electricity demand rose 2.1% in 2025, and the IEA expects data centers to drive about half of the growth through 2030.

    Source: International Energy Agency, Feb 2026

    Exact wording at the source
    In the United States, electricity demand rose by 2.1% in 2025 and is projected to grow by nearly 2% annually through 2030, with around half of the total increase driven by the rapid expansion of data centres.
  8. 8
    7,663 GWh

    Irish data centres used 7,663 GWh of metered electricity in 2025, up from 1,240 GWh in 2015.

    Exact wording at the source
    Data centre consumption has grown every single year without exception, more than doubling between 2015 and 2019 from 1,240 GWh to 2,490 GWh, and tripling again between 2019 and 2025, reaching 7,663 GWh
  9. 9
    23%

    Data centres took 23% of Ireland's metered electricity in 2025, close to the 28% used by all homes.

    Exact wording at the source
    accounted for 28% of usage, compared with 23% by data centres

Chart

Metered electricity used by data centres in Ireland

Annual metered consumption in GWh, Central Statistics Office, published July 2026.

  • 20151,240 GWh
  • 20192,490 GWh
  • 20257,663 GWh

Source: Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025: Key Findings

2

Capacity and construction

  1. 10
    1,360

    The 21 largest cloud and internet companies ran 1,360 hyperscale data centers at the end of 2025, 580 of them in the United States.

    Source: Synergy Research Group, Apr 2026

    Exact wording at the source
    Together they had 1,360 operational hyperscale data centers at the end of 2025, of which 580 are in the US.
  2. 11
    48%

    Hyperscale operators accounted for 48% of worldwide data center capacity at the end of 2025.

    Source: Synergy Research Group, Apr 2026

    Exact wording at the source
    The number of large data centers operated by hyperscale companies reached 1,360 at the end of the fourth quarter of 2025, and new data from Synergy Research Group shows that they now account for 48% of the worldwide capacity of all data centers.
  3. 12
    67%

    Synergy forecasts hyperscale operators will hold 67% of global data center capacity by 2031, with enterprise on-premise sites falling to 19%.

    Source: Synergy Research Group, Apr 2026

    Exact wording at the source
    Looking ahead to 2031, hyperscale operators will account for 67% of all capacity, while on-premise will drop to just 19%.
  4. 13
    Double

    Synergy expects total U.S. data center capacity to double between mid-2026 and mid-2029.

    Source: Synergy Research Group, Jul 2026

    Exact wording at the source
    Synergy Research Group, now part of TechInsights, today announced that despite various power and public opinion obstacles, its latest data shows that the total capacity of U.S. data centers will double in the next three years, driven by aggressive build-out of hyperscale operators’ owned data centers, which will double in operational capacity within just two years.
  5. 14
    45 gigawatts

    Synergy's pipeline of large U.S. projects adds about 45 GW of IT capacity, spread across 74 companies, as of July 2026.

    Source: Synergy Research Group, Jul 2026

    Exact wording at the source
    That represents around 45 gigawatts of IT capacity to be added in the U.S., driven by 74 different companies expanding their data center footprint.
  6. 15
    66 GW

    North America had 66 GW of data center capacity under construction in mid-2026, 95% of it pre-committed, according to JLL.

    Source: JLL, Aug 2026

    Exact wording at the source
    With vacancy sustained at 1% for the third consecutive year despite unprecedented construction activity, North America now has 66 GW under construction, 95% of which is pre-committed.
  7. 16
    25 GW

    North American data center absorption reached 25 GW in the first half of 2026, double the level a year earlier.

    Source: JLL, Aug 2026

    Exact wording at the source
    CHICAGO, August 11, 2026 – North America data center demand reached an all-time high in the first half of 2026 with 25 GW of absorption, double the level from a year ago and five times that of two years prior.
  8. 17
    7,481 MW

    CBRE counted a record 7,481 MW under construction across eight primary North American markets in the first half of 2026.

    Source: CBRE, Sep 2026

    Exact wording at the source
    The 7,481 megawatts (MW) under construction in H1 2026 surpassed the previous high reached in 2024.
  9. 18
    1.4%

    Vacancy across North America's primary data center markets was 1.4% in the first half of 2026.

    Source: CBRE, Sep 2026

    Exact wording at the source
    Vacancy held steady at 1.4% compared with year-end 2025.
  10. 19
    3,500 MW

    Digital Realty's land and space under development could hold over 3,500 MW of additional data center capacity as of December 31, 2025.

    Source: Digital Realty, Feb 2026

    Exact wording at the source
    In addition, as of December 31, 2025, we estimate that our land and other space held for, or actively under, construction could accommodate over 3,500 megawatts of additional data center capacity, including more than 1,000 additional megawatts developable in Northern Virginia.
3

Where data centers are built

  1. 20
    60%

    Twenty state or metro markets held 60% of the world's hyperscale data center capacity in mid-2026, and 15 of the top 20 were in the United States.

    Source: Synergy Research Group, Aug 2026

    Exact wording at the source
    It shows that just twenty state or metro markets account for 60% of the world’s current hyperscale data center capacity.
  2. 21
    17%

    Northern Virginia and the Greater Beijing area together held 17% of global hyperscale capacity in 2026.

    Source: Synergy Research Group, Aug 2026

    Exact wording at the source
    Northern Virginia in the US and the Greater Beijing Area of China alone make up 17% of the total.
  3. 22
    71%

    Operational hyperscale capacity in Texas grew 71% over the year to mid-2026, against 36% worldwide.

    Source: Synergy Research Group, Aug 2026

    Exact wording at the source
    Meanwhile, one of the biggest growth stories is Texas, whose operational hyperscale capacity has grown by 71% over the last year, compared with a worldwide average growth rate of 36%.
  4. 23
    53%

    Texas and the Midwest held 33% of operational U.S. hyperscale capacity at the end of 2025 but account for 53% of the capacity in the pipeline.

    Source: Synergy Research Group, Apr 2026

    Exact wording at the source
    At the end of 2025, Texas and the Midwest accounted for 33% of operational US hyperscale data center capacity, while Synergy's pipeline of future hyperscale data centers shows that they will account for 53% of new capacity coming online over the next few years.
  5. 24
    4,496.5 MW

    Northern Virginia, North America's largest market, reached 4,496.5 MW of inventory in the first half of 2026 after adding more than 1 GW in a year.

    Source: CBRE, Sep 2026

    Exact wording at the source
    Northern Virginia remained North America's largest data center market in the first half of 2026, expanding its inventory by more than 1 gigawatt (GW) over the past year to 4,496.5 megawatts (MW).
  6. 25
    26 GW

    Texas had 26 GW of existing and under-construction data center capacity in mid-2026, ahead of Virginia at 13 GW.

    Source: JLL, Aug 2026

    Exact wording at the source
    Texas has cemented its position as the state for data centers, with 26 GW of existing and under-construction capacity, followed by Virginia at 13 GW, while frontier markets now account for 77% of all capacity under development.
  7. 26
    14%

    Only 14% of Americans support data center development in their own community, while 79% support U.S. leadership in AI, JLL reports.

    Source: JLL, Aug 2026

    Exact wording at the source
    leadership in artificial intelligence, only 14% support data center development in their community, which is a 65-point support gap that threatens to constrain the infrastructure buildout required to maintain AI competitiveness.
  8. 27
    50%

    Half of the data centers under development in the United States are in existing large clusters, which can create local grid bottlenecks.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    We find that 50% of data centres under development in the United States are in pre-existing large clusters, potentially raising risks of local bottlenecks.

Chart

Growth in operational hyperscale capacity over the year to mid-2026

Synergy Research Group tracking of 21 major cloud and internet firms, August 2026.

  • Texas71%
  • Worldwide36%

Source: Synergy Research Group, US Rises Again as Synergy Updates Its Ranking of Hyperscale Data Center Locations

4

Capital spending

  1. 28
    $142 billion

    Quarterly capital spending by hyperscale operators reached $142 billion in the third quarter of 2025, up almost 180% in three years.

    Source: Synergy Research Group, Dec 2025

    Exact wording at the source
    Over the last three years, quarterly hyperscale operator capex has ballooned, growing by almost 180% and reaching $142 billion in Q3 of this year.
  2. 29
    $75.9 billion

    Amazon's cash capital expenditures were $75.9 billion in the third quarter of 2026, up from $34.2 billion a year earlier, mostly for technology infrastructure.

    Source: Amazon, Oct 2026

    Exact wording at the source
    Cash capital expenditures were $34.2 billion and $75.9 billion during Q3 2025 and Q3 2026, and $89.9 billion and $172.2 billion for the nine months ended September 30, 2025 and 2026, which primarily reflect investments in technology infrastructure (the majority of which is to support AWS business growth) and in additional capacity to support our fulfillment network, both of which we expect to increase in 2026.
  3. 30
    $172.2 billion

    Amazon spent $172.2 billion in cash capital expenditures in the first nine months of 2026, against $89.9 billion in the same period of 2025.

    Source: Amazon, Oct 2026

    Exact wording at the source
    Cash capital expenditures were $34.2 billion and $75.9 billion during Q3 2025 and Q3 2026, and $89.9 billion and $172.2 billion for the nine months ended September 30, 2025 and 2026, which primarily reflect investments in technology infrastructure (the majority of which is to support AWS business growth) and in additional capacity to support our fulfillment network, both of which we expect to increase in 2026.
  4. 31
    $51.4 billion

    Alphabet's capital expenditures were $51.4 billion in the third quarter of 2026, mainly for technical infrastructure.

    Source: Alphabet, Oct 2026

    Exact wording at the source
    Capital expenditures, which primarily reflected investments in technical infrastructure, were $51.4 billion for the three months ended September 30, 2026.
  5. 32
    $34.91 billion

    Meta's capital expenditures, including finance lease principal payments, were $34.91 billion in the third quarter of 2026.

    Source: Meta Platforms, Oct 2026

    Exact wording at the source
    Capital expenditures – Capital expenditures, including principal payments on finance leases, were $34.91 billion.
  6. 33
    $135-145 billion

    Meta expects full-year 2026 capital expenditures of $135 to $145 billion, including finance lease principal payments.

    Source: Meta Platforms, Oct 2026

    Exact wording at the source
    We anticipate 2026 capital expenditures, including principal payments on finance leases, to be in the range of $135-145 billion, narrowed from our prior outlook of $130-145 billion.
  7. 34
    $51.4 billion

    Microsoft's additions to property and equipment rose by $51.4 billion in fiscal year 2026, which ended June 30, 2026.

    Source: Microsoft, Jul 2026

    Exact wording at the source
    Cash used in investing increased $66.9 billion to $139.5 billion for fiscal year 2026, primarily due to a $51.4 billion increase in additions to property and equipment and a $22.2 billion increase in cash used in other investing primarily to facilitate the purchase of components, offset in part by a $4.2 billion decrease in cash used in the acquisition of companies, net of cash acquired and divestitures, and purchases of intangible and other assets and a $2.4 billion decrease in cash used in net investment purchases, sales, and maturities.
  8. 35
    $700 billion

    JLL expects data center construction to drive more than $700 billion of permanent debt originations in North America over the 30 months from mid-2026.

    Source: JLL, Aug 2026

    Exact wording at the source
    Construction activity is expected to drive more than $700 billion in permanent debt originations over the next 30 months, reflecting investor confidence in the sector’s long-term fundamentals.
  9. 36
    Nearly 70%

    North American data center rents have risen nearly 70% since 2020, an average of 9% a year.

    Source: JLL, Aug 2026

    Exact wording at the source
    Data center rental rates have increased nearly 70% since 2020, with rent growth averaging 9% annually and positioning landlords to capture significant spreads at lease expiration.

Chart

Amazon cash capital expenditures, third quarter

Billions of U.S. dollars, from Amazon's Form 10-Q for the quarter ended September 30, 2026.

  • Q3 2025$34.2
  • Q3 2026$75.9

Source: Amazon, Amazon.com, Inc. Form 10-Q for the quarter ended September 30, 2026

5

Efficiency, rack density and water

  1. 37
    1.52

    The average annual PUE reported by data center operators was 1.52 in 2026, continuing seven years of little change.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    The 2026 industry average PUE is 1.52 (see Figure 2), a figure that falls right in line with a seven-year trend of relative stasis.
  2. 38
    1.45

    The average PUE of respondents' largest data centers was 1.45 in 2026.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    Globally, the average annual PUE of respondents’ largest data centers (which may be different from the one they work in) was 1.45.
  3. 39
    23%

    Almost one in four surveyed operators (23%) work in a data center averaging below 1.3 PUE in 2026.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    Importantly, almost one in four respondents (23%) work in a data center averaging below 1.3 PUE.
  4. 40
    11 kW

    The average typical rack density in Uptime Institute's 2026 sample passed 11 kW for the first time.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    For the first time, the average of modal (most typical) rack densities surpassed 11 kW in our sample, as the gradual shift toward higher-powered hardware was compounded by a small number of new high-density facilities with typical racks above 30 kW.
  5. 41
    24%

    24% of operators had some racks of 30 kW or more in 2026, up from 19% in 2025.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    However, more respondents (24%) now say they have some of these racks, up from 19% in 2025.
  6. 42
    71%

    Colocation providers record water usage at a rate of 71%, higher than enterprise or cloud operators, in Uptime Institute's 2026 survey.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    Colocation providers report recording PUE (94%), renewable energy (60%) and water usage (71%) at higher rates than enterprise or cloud operators, primarily because their customers expect it.
  7. 43
    1.09

    Google's data center fleet ran at an average PUE of 1.09 in 2025.

    Source: Google, Jun 2026

    Exact wording at the source
    Google’s data centers are among the industry’s most efficient, operating with a 2025 fleet-wide average power usage effectiveness (PUE) of 1.09 and using 83% less overhead energy than the industry average.
  8. 44
    10.9 billion gallons

    Google consumed 10.9 billion gallons of water across its data centers and offices in 2025, and its freshwater consumption rose 37% in the year.

    Source: Google, Jun 2026

    Exact wording at the source
    In 2025, we consumed 10.9 billion gallons (41 billion liters or 41 million cubic meters) of water across our data centers and offices.
  9. 45
    0.27 L/kWh

    Microsoft's owned datacenters averaged a water usage effectiveness of 0.27 liters per kWh in fiscal 2025, 25% below its 2022 baseline.

    Source: Microsoft, Jun 2026

    Exact wording at the source
    Based on our FY25 global average WUE of 0.27 L/kWh, our owned datacenters have achieved a 25% reduction in WUE since our 2022 baseline, progressing towards our 2030 target of a 40% reduction.
  10. 46
    7% to over 30%

    Cooling ranges from about 7% of electricity use in efficient hyperscale data centers to over 30% in less efficient enterprise sites.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    The share of cooling systems in total data centre consumption varies from about 7% for efficient hyperscale data centres to over 30% for less-efficient enterprise data centres.

Chart

Operators with some racks of 30 kW or more

Share of Uptime Institute survey respondents, 2025 and 2026.

  • 202519%
  • 202624%

Source: Uptime Institute, Uptime Institute Global Data Center Survey 2026

6

Power supply and the grid

  1. 47
    Over 40%

    Natural gas supplied over 40% of the electricity used by U.S. data centers in 2024, followed by renewables at 24%.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    With a share of over 40%, natural gas is currently the biggest source of electricity for data centres in the United States, followed by renewables – mostly solar PV and wind – with 24%, as well as nuclear and coal power with shares of around 20% and 15%, respectively.
  2. 48
    27%

    Renewables supplied about 27% of the electricity consumed by data centers globally in 2024.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    Renewables – primarily wind, solar PV and hydro – currently supply about 27% of the electricity consumed by data centres globally.
  3. 49
    20%

    The IEA estimates about 20% of planned data center projects could face delays unless grid risks are addressed.

    Source: International Energy Agency, Apr 2025

    Exact wording at the source
    Smarter is faster when it comes to integrating data centres in electricity grids Electricity grids are already under strain in many places: we estimate that unless these risks are addressed, around 20% of planned data centre projects could be at risk of delays.
  4. 50
    85,000 MW

    PJM expects its summer peak to rise about 85,000 MW to over 241,000 MW over the 15 years from 2026.

    Source: PJM Interconnection, Jan 2026

    Exact wording at the source
    According to the report, released Jan. 14, PJM expects its summer peak to climb about 85,000 MW, to over 241,000 MW, over the next 15 years.
  5. 51
    0.3%

    PJM's 2021 forecast expected only 0.3% annual load growth, less than a tenth of the rate in its 2026 forecast, a shift driven by data centers.

    Source: PJM Interconnection, Jan 2026

    Exact wording at the source
    For perspective on how data centers have impacted the long-term outlook, the 10-year average annual growth rate estimated in the 2021 Long-Term Load Forecast was 0.3% per year, less than one-tenth the current forecasted annual growth rate.
  6. 52
    10%

    EIA forecasts annual electricity load growth averaging 10% in ERCOT and 3% in PJM between 2025 and 2027, the fastest in the country because of data centers.

    Exact wording at the source
    We expect that the highest load growth will be in the ERCOT and PJM regions where forecast growth of annual electricity load averages 10% and 3%, respectively, between 2025 and 2027.
  7. 53
    581 BkWh

    In EIA's High Electricity Demand case, servers in standalone data centers consume 581 billion kWh in 2050.

    Exact wording at the source
    Standalone data centers are represented in the other buildings category, where we project servers will consume 581 BkWh of electricity in 2050 in our High Electricity Demand case.
  8. 54
    79%

    79% of data center operators said management is at least somewhat concerned about costs in 2026, the top-ranked concern.

    Source: Uptime Institute, Jul 2026

    Exact wording at the source
    Cost issues remain the highest-ranked concern, with 79% of respondents saying management is at least somewhat concerned (see Figure 1).

FAQ

Questions readers ask

How much electricity do data centers use?
About 415 TWh worldwide in 2024, roughly 1.5% of global electricity, according to the IEA, which expects around 945 TWh by 2030. U.S. data centers used 176 TWh, or 4.4% of national electricity, in 2023, by Berkeley Lab's estimate.
How fast is data center capacity growing?
Synergy Research Group expects total U.S. data center capacity to double within three years of mid-2026, with about 45 GW of IT capacity in the U.S. pipeline. JLL reports 66 GW under construction in North America, 95% of it pre-committed.
How much are tech companies spending on data centers?
Amazon's cash capital expenditures were $75.9 billion in the third quarter of 2026, Alphabet's $51.4 billion and Meta's $34.91 billion. Meta expects $135 to $145 billion for all of 2026. These totals include servers and chips as well as buildings.
Where are the most data centers located?
Northern Virginia is the largest market, with 4,496.5 MW of inventory in the first half of 2026 according to CBRE. Twenty metro or state markets hold 60% of global hyperscale capacity, 15 of them in the United States, and Texas is growing fastest, up 71% in a year by Synergy's count.
How much water do data centers use?
It varies by cooling design and climate. Google consumed 10.9 billion gallons across its data centers and offices in 2025, and Microsoft reports an average of 0.27 liters of water per kWh at its owned datacenters in fiscal 2025.
What is the average PUE of a data center?
Uptime Institute's 2026 survey puts the industry average at 1.52, meaning about 0.52 watts of overhead for every watt of IT load. Large new hyperscale sites run lower; Google reports a fleet average of 1.09 for 2025.

Sources

We chose figures from public agencies (IEA, Department of Energy, Berkeley Lab, EIA, Ireland's Central Statistics Office), grid operators (PJM), industry researchers that run their own surveys or tracking (Uptime Institute, Synergy Research Group, CBRE, JLL) and companies reporting on their own operations in SEC filings, earnings releases and sustainability reports. Global and U.S. electricity totals are modeled estimates and come with wide ranges; Ireland's figure is metered. Capacity measures differ: Synergy tracks hyperscale operators worldwide, CBRE tracks eight primary North American colocation markets and JLL counts a broader North American pipeline, so their totals are not interchangeable. Company capital spending includes servers, chips and land as well as buildings, and Meta includes finance lease principal payments. PUE and water figures are self-reported by operators. Forecasts are labeled with the year they describe. We store the sentence each number appears in, and a script reloads the publisher's page to confirm it is still there. The methodology has the details.

  1. Alphabet. Alphabet Inc. Form 10-Q for the quarter ended September 30, 2026 (Oct 2026).
  2. Amazon. Amazon.com, Inc. Form 10-Q for the quarter ended September 30, 2026 (Oct 2026).
  3. CBRE. North American Data Center Demand Continues to Outpace Supply Despite Record Construction Activity (Sep 2026).
  4. Central Statistics Office (Ireland). Data Centres Metered Electricity Consumption 2025: Key Findings (Jul 2026).
  5. Digital Realty. Digital Realty Trust, Inc. Form 10-K for the fiscal year ended December 31, 2025 (Feb 2026).
  6. Google. Operating sustainably: Google Data Centers (Jun 2026).
  7. Google. Google 2026 Environmental Report (Jun 2026).
  8. International Energy Agency. Energy and AI: Executive summary (Apr 2025).
  9. International Energy Agency. Electricity 2026: Executive summary (Feb 2026).
  10. International Energy Agency. Energy and AI: Energy demand from AI (Apr 2025).
  11. International Energy Agency. Energy and AI: Energy supply for AI (Apr 2025).
  12. JLL. Data center demand exceeds expectations as H1 2026 absorption hits record 25 GW (Aug 2026).
  13. Lawrence Berkeley National Laboratory. Berkeley Lab Report Evaluates Increase in Electricity Demand from Data Centers (Jan 2025).
  14. Meta Platforms. Meta Reports Third Quarter 2026 Results (Oct 2026).
  15. Microsoft. Microsoft Corporation Form 10-K for the fiscal year ended June 30, 2026 (Jul 2026).
  16. Microsoft. 2026 Environmental Sustainability Report (Jun 2026).
  17. PJM Interconnection. PJM's Updated 20-Year Forecast Continues To See Significant Long-Term Load Growth (Jan 2026).
  18. Synergy Research Group. U.S. Hyperscale Investment Shifts Decisively Inland (Apr 2026).
  19. Synergy Research Group. Hyperscale Operators to Account for 67% of all Data Center Capacity by 2031 (Apr 2026).
  20. Synergy Research Group. Synergy Reports that U.S. Data Center Capacity Will Continue to Balloon Despite Increasing Headwinds (Jul 2026).
  21. Synergy Research Group. US Rises Again as Synergy Updates Its Ranking of Hyperscale Data Center Locations (Aug 2026).
  22. Synergy Research Group. Hyperscale Spending Spree is Driving Dramatic Growth in Data Center Capacity (Dec 2025).
  23. U.S. Department of Energy. DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers (Dec 2024).
  24. U.S. Energy Information Administration. Today in Energy: data center growth and the electricity outlook through 2027 (Mar 2026).
  25. U.S. Energy Information Administration. Today in Energy: Data center server energy use grows across the commercial building stock (May 2026).
  26. Uptime Institute. Uptime Institute Global Data Center Survey 2026 (Jul 2026).

Cite this page

Link to this page or to a single numbered figure. If you reuse a number, name the organization that first published it.

FruitPunch. (2026, November 15). Data Center Statistics 2026. https://fruitpunch.ai/data-center-statistics